Maintenance contracts for IKA C 1 Package 1/12
A service visit on the IKA C 1 Package 1/12 covers the decomposition vessel — pressure test and seal replacement — the oxygen filling system, the temperature measurement and water circuit, and a calibration with certified benzoic acid.
Every visit includes calibration and performance verification, and closes with a documented maintenance report you can present during an accreditation audit. Spare-parts availability and a guaranteed response time are written into the contract, so a breakdown never leaves a department waiting for an answer.
Calorimeters like the IKA C 1 Package 1/12 are normally serviced and recalibrated once a year, while decomposition vessels are pressure-tested at the interval and after the number of combustions the manufacturer specifies.
- Decomposition vessel pressure-tested and seals replaced
- Oxygen filling system and valves checked
- Temperature measurement and water circuit checked
- Calibration with certified benzoic acid







