BOECO Gas Burner Fuego SCS — main photograph
BOECO GermanyAvailability: Supplied to order

BOECO Gas Burner Fuego SCS

Reference BOE 8201000

Laboratory gas burner by BOECO Germany

Request a service for this equipment

Nothing is charged online. Every request is reviewed by an AxiTech engineer before you receive a quotation.

At a glance

Reference
BOE 8201000
Category
Ovens, Furnaces & Water Baths
Product range
Laboratory Gas Burner

Overview

SAFETY LABORATORY GAS BURNER

is a new standard among laboratory gas burners. With its innovative design this laboratory gas urner is suitable for all flame related applications in the laboratory.

Technical specifications

CE
EN 61326-1, EN61000-3-2, EN 61010
Button
Start-Stop with timer, 60 min
Weight
700 g
Gas types
natural gas E/LL, 18 - 25 mbar; liquid gas II2ELL3B/P, 20 - 50 mbar
Foot pedal
Standard (flame during pressed foot pedal) Start-Stop with timer, 60 min
Technology
Microprocessor
Connected load
70 g/h liquid gas
EEC guidelines
89/336/EEC, 73/23/EEC
Show 10 more specifications
Gas connection
1/4” left with gas filter
DIN-DVGW Reg.-No
NG-2211AS0167
Power connection
100 - 240 V / 50/60 Hz / max 0,3 A 9 V DC / 1A
Size (w x h x d)
103 x 49 x 130 mm
Flame temperature
1350 °C on liquid gas ;1300 °C on natural gas (E)
Power consumption
2VA
Cover of burner shaft
Ø 23 mm, with drains
Casing and operation controls
stainless steel / glass, UV and solvent resistant
Continuous cartridge operation
CV 360 - 40 min, Express 444 -50 min CG 1750 - 150 min, C 206 - 170 min CP 250 - 210 min, CV 470 - 370 min
Safety Control System (SCS) with gas safety cut off
ignition and flame control temperature monitor burner head clogging and assembly monitor (BHC) automatic unit switch off, 4 h residual heat display
Service coverage

AxiTech maintains, repairs and supplies this equipment for hospitals, clinics, laboratories and imaging centres.

Maintenance contracts for BOECO Gas Burner Fuego SCS

A service visit on the BOECO Gas Burner Fuego SCS covers a functional check against the manufacturer's specification, calibration of the parameters it measures or controls, replacement of wear parts, and electrical safety testing.

Every visit includes calibration and performance verification, and closes with a documented maintenance report you can present during an accreditation audit. Spare-parts availability and a guaranteed response time are written into the contract, so a breakdown never leaves a department waiting for an answer.

Plan at least one preventive maintenance visit per year for the BOECO Gas Burner Fuego SCS, and a second visit for equipment in continuous or critical use.

  • Functional check against the manufacturer's specification
  • Calibration of the parameters it measures or controls
  • Wear parts inspected and replaced before they fail
  • Electrical safety tested and documented

Discover our maintenance contracts

Planned preventive maintenance and calibration under contract

Troubleshooting and repair for BOECO Gas Burner Fuego SCS

When BOECO Gas Burner Fuego SCS fails, our engineers start with a structured diagnostic: error codes, electrical and mechanical checks, and a functional test against the equipment’s own specification. That tells us whether the fault is a consumable, a worn part or a board-level failure before any part is ordered.

Straightforward faults are repaired on site so the department loses as little time as possible. Anything that needs a workbench, a full strip-down or a specialised spare part goes to our workshop and comes back only after a complete post-repair test and, where the equipment requires it, recalibration.

Faults we see most often on this type of equipment

Common faults are worn moving parts, power-supply and control-board failures, sensors that have drifted out of tolerance, and fluid or air paths that have become blocked or contaminated.

Discover our troubleshooting and repair service

Diagnostics, corrective repair and spare parts in the workshop
Troubleshooting

How to troubleshoot BOECO Gas Burner Fuego SCS

Work through these checks before you escalate. They are the same first-line sequence our biomedical engineers run on arrival, and they either clear the fault or narrow it down enough that the intervention starts with the right spare part in the van.

  1. Capture the fault before you touch anything: write down the exact error code or message, the serial number from the rating plate, what the operator was doing and whether the fault clears on a restart.

  2. Confirm the power supply end to end — wall outlet, mains lead, fuse and any UPS or stabiliser in between. A device that is intermittently dead has a supply fault far more often than an internal one.

  3. Check the consumables and wear parts — filters, seals, tubing, probes, batteries — and note when each was last replaced. Anything past its service interval is the first suspect.

  4. Reproduce the fault once, deliberately, and record the sequence: what the operator did, what the device displayed, and whether a full power cycle clears it.

  5. If the fault is still there, escalate with the evidence. Send AxiTech the model, serial number, error code and the checks you have already run, and an engineer will come back with a diagnosis, a repair quote and a spare-parts lead time for BOECO Gas Burner Fuego SCS.

What to send us when you report the fault

  • Manufacturer, model and serial number, from the rating plate
  • The exact error code or message, and the screen it appears on
  • When the fault started, how often it occurs and what triggers it
  • A photograph of the display or of the fault, and the last maintenance report

If the fault survives all five steps, stop using BOECO Gas Burner Fuego SCS and open a repair request. Continuing to run equipment through a fault it cannot clear turns a component failure into a board-level one, and on devices used for diagnosis or therapy it puts the result — and the patient — in doubt.

Discover our troubleshooting and repair service

Buying and installing BOECO Gas Burner Fuego SCS

AxiTech supplies BOECO Gas Burner Fuego SCS together with the accessories and consumables it needs to enter service. We handle importation, delivery and installation, then commission the equipment on site so that it is verified against its specification before the first patient or the first sample.

Installation is followed by training for the users and for your biomedical team, warranty registration, and — if you want it — a maintenance contract that takes over the day the warranty ends, so the equipment never spends a period without planned service.

Discover our equipment sales service

Delivery, installation, commissioning and user training
Product FAQ

Questions about the BOECO Gas Burner Fuego SCS

Plan for the following when installing the BOECO Gas Burner Fuego SCS: power input 2VA; weight 700 g. AxiTech delivers, installs and commissions it, then verifies it against the manufacturer's specification before handover.