IC basic — main photograph
IKAAvailability: Supplied to order

IC basic

Reference 0003861000

IC basic laboratory stirrer from IKA — AxiTech supports hospitals, clinics and laboratories with sales, installation, maintenance contracts, calibration, repair and spare parts for this equipment.

Request a service for this equipment

Nothing is charged online. Every request is reviewed by an AxiTech engineer before you receive a quotation.

At a glance

Reference
0003861000
Category
Shakers, Stirrers & Mixers

Overview

IC basic The IC basic immersion circulator is used for tempering liquids in open or covered water baths up to 250 °C. The circulator has an adjustable bridge that can be replaced by a fixed bridge. With the integrated powerful pressure/suction pump, the IC basic can be used for internal and external applications. A cooling coil can be connected to the circulator to temper near-ambient temperatures. All IKA circulating baths conform to the highest safety classification III (FL) for use with flammable liquids according to DIN 12876. The IC basic immersion circulators allow for quick heat-up times and stable temperautre conditions. With integrated connections (M16x1) the device is suitable for external applications. Temperature range: RT - 250 °C Temperature stability is ± 0.02 K Stainless steel bath bridge can be combined with water baths of different volumes Adjustable safety circuit Powerful pressure/suction pump Large easy to read LED display for pump speed and temperature Push and turn buttons for intuitive menu navigation Connection for external PT 100 temperature probe Visual and acoustic safety warnings USB / RS 232 interface for PC control and documentation using labworldsoft

Maintenance contract — AxiTech provides planned preventive maintenance for IC basic from IKA: scheduled visits, safety checks, periodic calibration and a documented service report, backed by a contractual response time.

Troubleshooting, repair and spare parts — our shakers, stirrers & mixers engineers diagnose and repair IC basic on site or in the workshop, fit genuine spare parts and recommission the equipment after performance verification.

Features

  • Temperature range: RT - 250 °C
  • Temperature stability is ± 0.02 K
  • Stainless steel bath bridge can be combined with water baths of different volumes
  • Adjustable safety circuit
  • Powerful pressure/suction pump
  • Large easy to read LED display for pump speed and temperature
  • Push and turn buttons for intuitive menu navigation
  • Connection for external PT 100 temperature probe
  • Visual and acoustic safety warnings
  • USB / RS 232 interface for PC control and documentation using labworldsoft®, as well as for online firmware updates
  • Hose olive NW 12 (2 pcs.)
  • Screwdriver
  • USB Cable - USB A to Micro-B, 2 m

Technical specifications

Specifications
Weight
10 kg
Voltage
230 V
Frequency
50/60 Hz
Pump type
Pressure- / suction pump
Heat output
2500 W
Power input
2650 W
USB interface
Micro-USB
Appliance type
Immersion thermostat
Bath depth min.
150 mm
Pump connection
M16x1
RS 232 interface
yes
Appliance fastener
Bridge
Calibration option
yes
Display resolution
0.1 K
Permissible ON time
100 %
Temperature control
PID
Temperature display
yes
Working temperature
room temp. +10K @1000rpm - 250 °C
Sub level protection
yes
Over level protection
yes
Dimensions (W x H x D)
285 x 313 x 291 mm
Pump capacity adjustable
yes
Range of universal clamp
280 - 375 mm
Warning function optical
yes
Adjustable safety circuit
0 - 260 °C
Safety temperature sensor
PT1000
Warning function acoustic
yes
Safety temperature display
LED
Set temperature resolution
0.1 K
Working temperature sensor
PT 100
Working temperature display
LED
Permissible relative humidity
80 %
Permissible ambient temperature
5 - 40 °C
Temperature stability DIN 12876
±0.02 K
Class designation acc. DIN 12876
III
Warning function excess temperature
yes
Flow rate max. (0 bar back pressure)
31 l/min
Identification according to DIN 12876
FL
Connection for ext. temperature sensor
PT 100
Display for operation with ext. sensor
yes
Technical data complies with the standard
DIN 12876
Protection class according to DIN EN 60529
IP 21
Pressure pump (suction side) (0 liter flow)
0.45 bar
Pump pressure max. (0 liters discharge flow)
0.61 bar
Operating temperature min. (with external cooling)
-20 °C
Service coverage

AxiTech maintains, repairs and supplies this equipment for hospitals, clinics, laboratories and imaging centres.

Maintenance contracts for IC basic

AxiTech provides preventive maintenance contracts for IC basic. Each contract fixes a schedule of planned visits in which our biomedical engineers inspect the equipment, replace wear parts before they fail, and verify that it still performs inside the manufacturer’s tolerances.

Every visit includes calibration and performance verification, and closes with a documented maintenance report you can present during an accreditation audit. Spare-parts availability and a guaranteed response time are written into the contract, so a breakdown never leaves a department waiting for an answer.

Plan at least one preventive maintenance visit per year, and a second visit for equipment in continuous or critical use.

  • Planned preventive maintenance visits at a fixed interval
  • Calibration and performance verification against the manufacturer’s specifications
  • A documented maintenance report after every intervention
  • Guaranteed availability of spare parts and consumables
  • A contractual response time when the equipment fails

Discover our maintenance contracts

Planned preventive maintenance and calibration under contract

Troubleshooting and repair for IC basic

When IC basic fails, our engineers start with a structured diagnostic: error codes, electrical and mechanical checks, and a functional test against the equipment’s own specification. That tells us whether the fault is a consumable, a worn part or a board-level failure before any part is ordered.

Straightforward faults are repaired on site so the department loses as little time as possible. Anything that needs a workbench, a full strip-down or a specialised spare part goes to our workshop and comes back only after a complete post-repair test and, where the equipment requires it, recalibration.

Faults we see most often on this type of equipment

The faults we see most often are worn moving parts, power-supply and control-board failures, sensors that have drifted out of tolerance, and fluid or air paths that have become blocked or contaminated.

Discover our troubleshooting and repair service

Diagnostics, corrective repair and spare parts in the workshop
Troubleshooting

How to troubleshoot IC basic

Work through these checks before you escalate. They are the same first-line sequence our biomedical engineers run on arrival, and they either clear the fault or narrow it down enough that the intervention starts with the right spare part in the van.

  1. Capture the fault before you touch anything: write down the exact error code or message, the serial number from the rating plate, what the operator was doing and whether the fault clears on a restart.

  2. Confirm the power supply end to end — wall outlet, mains lead, fuse and any UPS or stabiliser in between. A device that is intermittently dead has a supply fault far more often than an internal one.

  3. Check the consumables and wear parts — filters, seals, tubing, probes, batteries — and note when each was last replaced. Anything past its service interval is the first suspect.

  4. Reproduce the fault once, deliberately, and record the sequence: what the operator did, what the device displayed, and whether a full power cycle clears it.

  5. If the fault is still there, escalate with the evidence. Send AxiTech the model, serial number, error code and the checks you have already run, and an engineer will come back with a diagnosis, a repair quote and a spare-parts lead time for IC basic.

What to send us when you report the fault

  • Manufacturer, model and serial number, from the rating plate
  • The exact error code or message, and the screen it appears on
  • When the fault started, how often it occurs and what triggers it
  • A photograph of the display or of the fault, and the last maintenance report

If the fault survives all five steps, stop using IC basic and open a repair request. Continuing to run equipment through a fault it cannot clear turns a component failure into a board-level one, and on devices used for diagnosis or therapy it puts the result — and the patient — in doubt.

Discover our troubleshooting and repair service

Buying and installing IC basic

AxiTech supplies IC basic together with the accessories and consumables it needs to enter service. We handle importation, delivery and installation, then commission the equipment on site so that it is verified against its specification before the first patient or the first sample.

Installation is followed by training for the users and for your biomedical team, warranty registration, and — if you want it — a maintenance contract that takes over the day the warranty ends, so the equipment never spends a period without planned service.

Discover our equipment sales service

Delivery, installation, commissioning and user training
Questions we are asked

Frequently asked questions about IKA IC basic

Yes. AxiTech services IC basic, either under a maintenance contract or as a one-off intervention. Our biomedical engineers cover preventive maintenance, calibration, corrective repair and spare-parts supply for this equipment.

Other IKA equipment we supply, install and maintain.